Knowledge Base · Part 2 of 2

DFM Cost-Saving Guide (Part 2)

Part 1 covered the shape of the part — walls, holes, corners, tolerances. Part 2 covers what a drawing tends to treat as an afterthought: threads, counterbores, edge breaks, burrs — and then the four things a drawing never states at all, which decide why two shops quote the same file at prices that look unrelated: quantity, fixturing, inspection level and material condition.

1. Threads — "M6 × 15 deep" is not a specification

A tapped hole only carries load where the thread is full. At the bottom, the tap's lead-in cuts a tapering, incomplete thread profile. So "15 deep" can mean 15 mm of drilled hole and only 11 or 12 mm of thread that actually holds. On a part that vibrates, that gap is the difference between a joint that stays tight and one that strips.

Where the thread in a blind hole actually is part cross-section, hole drilled from the left Full thread — this is the only part the bolt can use Lead-in — the taper the tap cuts on its way in Clearance — where chips and the tap tip need room
A blind tapped hole is three things, and only the first one holds. A drawing that says "M6 × 15" leaves the split to the shop.
What the drawing saysWhat the shop doesWhat the bolt gets
M6 × 15drills 15, taps to depthabout 11–12 mm of usable thread — the rest is taper
M6, full thread 12 mindrills deeper, taps to leave 12 fullexactly what the joint needs
M6 throughdrills through, taps throughno depth question at all

For reference, the tap drill for a metric coarse thread is close to nominal minus pitch. Basic dimensions and pitch series are given in GB/T 196-2025 (current; it replaced GB/T 196-2003) and tolerances in GB/T 197-2018.

Metric coarsePitchTap drill ≈
M30.52.5 mm
M40.73.3 mm
M50.84.2 mm
M61.05.0 mm
M81.256.8 mm
M101.58.5 mm

Traps:

  • Fine pitch has a bigger tap drill and a shallower thread — use M8 × 1 only when you actually need adjustment or thin walls.
  • A threaded hole that bottoms out needs a bottoming tap. That is a second operation, not a deeper drill.
  • If the part is anodized after tapping, the coating grows the flanks of the thread and shifts the pitch diameter. Say so on the drawing — M4 and M5 in 6H go out of spec quickly.
DFM tip: write "full thread, 12 min" instead of a bare depth. A through-hole deletes the problem entirely — use one wherever the design allows.

2. Counterbores — you probably do not need ±0.05 on the depth

A counterbore exists so a screw head sits at or below the surface. What matters is that the head does not stand proud, and that enough material is left under it. Neither of those needs a tight depth tolerance — but a tight depth tolerance is what gets drawn.

What you writeWhat the shop doesEffect
depth ±0.05stop, measure, adjust — on every partmeasuring cost added to a feature that does not need it
depth 6.0 min, 6.5 maxone pass, spot-checkthe head is still clear, and nobody stops mid-cut
depth 6.0 min onlyone pass, no measuringcheapest, and usually correct

Counterbore sizes are already tabulated against screw heads, so they do not need to be invented. GB/T 152.2-2014 covers countersinks for countersunk head screws; GB/T 152.4 covers counterbores for hex head bolts and nuts.

Traps:

  • A counterbore on a curved, cast or forged face needs a spotface first — an extra tool and an extra operation.
  • Measuring counterbore depth from a rough surface gives a number that means nothing. Measure from the machined face.
  • A small-diameter counterbore that is deep needs a long, thin tool that deflects. Keep depth under about 2 × diameter.
DFM tip: if the drawing says "±", the shop has to measure. If it says "min", it does not. On counterbore depth, "min" is almost always the honest answer.

3. Edges — "sharp" is the most expensive word on the drawing

Almost no drawing says what to do with the edges. In the shop, every edge gets broken anyway: a razor edge cuts whoever packs the part, and it is a stress riser in service. But if the drawing stays silent, the work is done by hand — and hand work is the one cost that does not fall when quantity rises.

What the drawing saysHow the edge gets doneHow the cost behaves
nothinghand file or scraper, part by partfixed cost per part — does not scale down
"break sharp edges 0.3 max"chamfer tool, inside the programalmost nothing per part
chamfer or fillet dimensionedsame tool, already in the toolpathalmost nothing, and it is inspectable
sharp corner required by a seal or a datumhand work, then inspectionmost expensive of the four

Traps:

  • Edges on a curved or free-form surface cannot be followed by a chamfer tool — the hand work comes back.
  • A 0.1 mm chamfer on a large part is harder to hold than a 0.3 mm one. If the reason is appearance, 0.3 is enough.
  • Breaking the edge of a thread can damage the first turn. Chamfer the hole before tapping, not after.
DFM tip: one line — "break sharp edges 0.3 max" — turns a hand operation into a toolpath. It is the cheapest sentence you can add to a drawing.

4. Burrs — they live where one hole crosses another

A drill entering or leaving a surface raises a burr. On an outside face you can see it, and someone takes it off. The expensive ones are where a drill breaks into another hole: that burr ends up inside the part, where no file reaches. This is not a small point — flatness and freedom from burrs are written into standards for current-carrying parts, precisely because a loose burr inside an assembly is a failure waiting to happen.

SituationWhere the burr landsWhat it takes to remove
drill exits a flat outer faceon a face you can reachhand or tool deburr — cheap
drill breaks into a cross-holeinside the cross-holereachable only if the cross-hole is wide enough for a tool; otherwise rework or redesign
drill exits a curved or angled surfacea ragged edge on the curvereduce the exit angle, or add a flat pad for it to break through
slot milled in from the sidealong the whole slot edgetool deburr if the tool can reach the full length

Traps:

  • Two holes crossing near a wall leaves a burr in a cavity with one narrow opening. Specify the larger hole as the crossing one, so a tool can get in.
  • Blind holes collect burrs at the bottom, where nothing reaches. Where it matters, make it a through-hole.
  • Deburring adds an operation, and a second clamping. Budget for it on the drawing rather than discovering it in the quote.
DFM tip: every time a hole breaks into another feature, ask whether a tool can physically reach the burr. If the answer is no, the fix belongs in the design, not in the shop.

5. Quantity — somebody has to pay for the setup

Everything up to here described the part. From here on it is about the paperwork around the part — and this is where two shops quote the same file at prices that do not look like they belong to the same job.

A quote is always per this batch. Setup — programming, fixturing, first-article, dialling in — does not shrink when the batch shrinks. It has to be paid by whoever is in the batch. Ten pieces carry the whole setup; five hundred pieces share it. That is not a discount policy. It is arithmetic.

Which means ten pieces and five hundred pieces are not the same part made the same way. At ten we run slow, measure more, use general-purpose workholding. At five hundred we build a fixture, run at cycle, and sample. Both are honest. They are simply two different trades that happen to share a drawing.

What the enquiry saysWhat we quoteWhat you get later
"10 pieces"prototype process, all setup absorbed by those 10a high unit price, and a large drop when volume arrives
"10 pieces, roughly N per year after that"two prices — prototype and volume — plus the conditions behind the volume pricethe volume price is real from the start instead of renegotiated later
"500 pieces, one-off"production process, fixture includedthe lowest unit price — but the fixture is wasted if the design changes

Traps:

  • Partial delivery is not partial order. "Ship 100 now, 400 later" is still a 500-piece order — we buy material and plan for 500, and you get the volume price. Say it up front and it is simply true; say it after the invoice and it is a dispute.
  • A number that is too small can only be quoted small. Inflating the quantity to push the price down does not work either — it comes back at delivery, as a delay or a surcharge.
  • Annual usage matters more than batch size. Batch size decides the cycle time; annual usage decides whether a fixture is worth building at all.
DFM tip: one line — "prototype, then roughly N per year" — gets you two prices in a single reply, and removes the awkward conversation three months later.

6. Fixturing — the cost that never appears on a quote

No quote line says "fixture". The cost is folded into labour hours, which is why two quotes for the same part can differ by a number that appears to come from nowhere.

The choice of workholding is usually decided by two things you know and we can only guess: how complex the part is, and whether it will be revised. Both belong in the enquiry.

WorkholdingGood forBad for
General-purpose vice / soft jawsblock stock, one-offs, prototypesthin walls, irregular shapes, five-sided work
Bored soft jaws (turning)second op on an already-machined diameterthin rings and parts that crush easily
Dedicated fixturecomplex shape, stable quantity, design that will not changeparts that get revised — the fixture is then scrap
Vacuum or magnetic tablethin plate, large flat areasmall parts, or parts with through-holes that leak the vacuum away

Traps:

  • On a thin-wall part, the first operation is not cutting — it is holding the part without deforming it. That decision sets every dimension that follows.
  • The trigger for a dedicated fixture is not quantity alone. It is annual usage × shape complexity ÷ how often the design changes. Quantity alone gives the wrong answer on both ends.
  • A part that needs more than three setups is usually telling you something about the design, not about the fixture.
DFM tip: tell us whether the design is frozen. On a part that will be revised twice a year, a dedicated fixture is the most expensive way to save money.

7. Inspection level and material condition — two lines that move the price

A drawing states tolerances. It almost never states how they will be verified. That gap is worth money, and it is one of the few places where the buyer can lower the price without changing a single dimension.

What you ask forWhat we doWhen it is the right answer
"It has to fit"functional dimensions held, in-process sampling, certificate of conformance with the shipmentstructural parts, cosmetic parts, non-mating faces
Critical dimensions controlledfirst article + last article + 100% on the critical dimensionsanything with a fit or an assembly relationship
Full dimensional reportevery feature measured, report issuedfirst-article approval, or preventing an incoming-inspection argument
100% CMM with raw dataevery piece measured, data file suppliedmedical, aerospace, safety-critical parts

The trap here runs the other way from the rest of this guide. "Provide an inspection report" sounds careful and gets you a full dimensional report at a full report's price. "Only dimensions A, B and C need a report" is cheaper, and it is also the clearer instruction.

Material condition works the same way. The same grade can be supplied as generic stock or as certified, heat-traceable bar — the part behaves identically on the machine, but the documentation burden does not.

Material conditionWhat it meansWhen you need it
Generic stock, grade guaranteedthe alloy is what the drawing saysgeneral structural work
With mill certificate (3.1)a document travels with the materialexport shipments, customers who audit traceability
Heat-number traceable, certified barthe exact heat is known and recordedmedical, aerospace, pressure equipment, safety parts

Traps:

  • "Good material" is not a specification. Write the grade, the temper and the documentation requirement — 6061-T6 and 6061-T651 machine very differently, and the certificate you get depends on which one you named.
  • A material certificate is a document that ships with the goods. If it is not on the purchase order, it is not on the pallet.
  • Asking for 100% CMM on a part with two functional dimensions is paying for certainty you will never look at.
DFM tip: name the dimensions that need a report, and write grade + temper + certificate. Two sentences, and the quote has nowhere left to be ambiguous.

8. When the drawing says nothing, we have to guess

This is the quiet version of every point above. Missing information does not disappear — it becomes an assumption, the assumption becomes a price, and the price becomes an argument at delivery. These seven are the ones we meet most often.

#Usually missing from the drawingSo we assumeAnd the bill arrives as
1finishing happens after machiningquote as machinedthreads and tolerances eaten by coating; rework
2which general tolerance standard appliesour in-house defaultyour inspection standard and ours disagree
3stock form — bar, plate, forging, castingwhichever wastes least materialmaterial utilisation lands in the price
4which dimensions are actually criticaltreat them all as criticalyou pay inspection on dimensions nobody checks
5what the part assembles intoguarantee the part on its ownit does not fit
6quantity, and what comes after itquote this batch onlythe volume price never materialises
7delivery date and acceptance methodour standard lead timea lead-time argument in week three

None of these is a trick. They are all things a designer knows and simply did not expect to have to write down. The cheapest DFM review is the one where you go through this list before sending the file.

9. Eight things to check before you send the drawing

Part 1 gave five geometric rules. This is the companion list — all small, all cheap to fix on paper.

  1. Threads. Does the callout say how much full thread is needed, or only a depth? Could any of them be through-holes?
  2. Counterbores. Is the depth tolerance actually needed, or would a minimum do? Is any counterbore sitting on a rough or curved face?
  3. Edges. Is there one line telling the shop how to treat edges? If not, the work is being done by hand.
  4. Burrs. Does any hole break into another hole, or exit a curve? Can a tool reach the result?
  5. Quantity and annual usage. Does the enquiry say what this part is — a prototype, or the first batch of something bigger? A single number can only be quoted as a single number.
  6. Setup count. How many faces have to be machined, and is it obvious which ones must stay in the same setup? If it is not obvious, we will assume.
  7. Inspection. Which dimensions actually need a report? "Provide a report" and "A, B and C need a report" are two different prices.
  8. Material and finishing. Grade, temper, certificate required — and does anything get anodized, plated or painted after machining? The shop needs to know before it cuts threads or holds a tolerance.

None of these changes what the part does. All of them change what it costs. That is the whole point of a DFM review: the drawing should decide the price, not the shop's guess about what the drawing meant.

Need a Free DFM Review?

Send the drawing. We go through the geometry and the small features together, and come back with a quote and the points we would change — within 2 hours for a normal enquiry.